Resources in SAP Business One are an important building block and are used in the production and project management modules. Among other things, they are relevant for cost and time management. Indirectly, resources also have an influence on Material Requirements Planning (MRP).

VIDEO Resources in SAP Business One

Resources Scope

Resources can be goods, machines or labour used for the production of products and services. Essential data is carried along with them:

  • General information such as the name of the resource, the use over a barcode or the simultaneous status as an asset.
  • Information with reference to the dimension of time. That is, when and for how many time units the resource is available.
  • Data on the costs associated with a resource.

Use of resources in SAP Business One

Resources are found as an extra menu item in SAP Business One, but their application should be seen in the context of other modules or functions:

  • the production of SAP B1 sets the resources as components in BOMs in. In addition to an article and operations, the required resource can always be anchored there.
  • Project management utilises resources by using them in a Production order within a project. In this way, throughput times can be displayed, costs calculated and work orders planned.
  • the Material Requirements Planning we are influenced by the time factor. On the one hand, the availability of items in the production process depends on the availability of the associated resources. On the other hand, a reservation of the resource takes place through material requirements planning.
Resource master data in SAP Business One

Resource master data in SAP Business One

  • First, one defines the basics in the resource master data, such as the name, resource type and group, units of measure, expenditure methods, etc.
    Here you can also add up to 10 costs. The total costs are made up of these.
  • In the capacity data, an overview of capacities of the selected resources is presented.
  • The basis for calculating the capacities of the resources is stored in the planning data.
  • In another tab, the resource can be linked to an asset.
  • As with the business partner and item master records, one can use the tabs Properties, Attachments and Remarks for the resource master data.
  • Employees can be linked to the resource if the resource type is "work".

Processing the capacities

The data displayed for the capacity comes from the Planning Data tab of the
Resource master data. These can be manually adjusted under the separate menu item Resource capacity. This is an easy way to make quick changes, e.g. for holidays or machine maintenance.

Capacities in SAP Business One
MARIProject Update 7.1

New Version MARIProject 7.1.000

MARIProject for SAP Business One has been released in a new version 7.1.000 and is available as an update. As always, there are ...
MARI Project Update 7.0

MARIProject – New Version 7.0

MARIProject for SAP Business One is now available in the new version 7.0. As always, a whole ...
MariProject Dashboards

Dashboard functions in MARIProject

SAP Business One has had distinctive functionalities for creating dashboards since version 9 at the latest. But also MARIProject, integrated project software ...
New MARIProject Version 6.7

New MARIProject Version 6.7

Shortly before the turn of the year, Maringo released a new version 6.7 of MARIProject. Among other things, task management has been expanded and ...
MariProject turn of the year

Turn of the year in MARIProject

After the work at the turn of the year in SAP Business One has been completed, the users of MARIProject still have to carry out a few routines in ...
Plants & mechanical engineering

Plant construction projects or mechanical engineering projects

Mechanical and plant engineering are often mentioned in the same breath. This could lead to the assumption that projects in plant construction ...