ERP for the plastics industry
18 July

ERP for the plastics industry

An ERP system in the plastics industry can only score a few points with the usual PPS functions. They are indeed necessary as a basis, but the industry-specific requirements on the ERP are in the foreground. These split into two directions: the commercial ? and the technical requirements of the plastics industry.

0

In all technical fields the plastics industry has enormous demands on the ERP system. There, the actual practicality of the system must prove itself in constant series production. The best way to do this is with effective production preparation.

Cavities in the plastics industry

First, all cavities of the mould should be listed in the ERP in their number. Cavities are the number of products that can be produced with one cycle of the mould. The quantity of cavities can thus be included in the planning of resources.
In the plastics industry, decisions about machine occupancy must always be made. When the ERP system processes, the Production order If it is possible to bring the machines forward or split them up, the staffing of the machines can be made much more flexible and can react quickly to changing requirements. It is also possible for the machines to send the number of products manufactured online to the ERP system.
Normally, a certain amount of granulate is reused in the plastics industry. The portion that enters the production cycle must be able to be generated in quantity and value by the ERP.

Blanket orders and call-offs

Commercially, an ERP in the plastics industry mainly has to manage blanket orders and call-offs. These framework agreements differ completely, which is why an ERP system in this industry should have as many options as possible for these framework orders. In order to meet the individual wishes of the customer, the call-offs should be imported directly into the ERP. In this way, errors can be avoided and the sales department is relieved. It is of great advantage if the ERP can assign whether the tools belong to the customer or to the plastics producer. It is also absolutely necessary to have a high-performance module for the calculation the high prices in the plastics industry.

© 2014 | Versino Projects GmbH

MARI Project Update 7.0

MARIProject – New Version 7.0

MARIProject for SAP Business One is now available in the new version 7.0. As always, a whole ...
Continue reading ?
New MARIProject Version 6.7

New MARIProject Version 6.7

Shortly before the turn of the year, Maringo released a new version 6.7 of MARIProject. Among other things, task management has been expanded and ...
Continue reading ?
Plants & mechanical engineering

Plant construction projects or mechanical engineering projects

Mechanical and plant engineering are often mentioned in the same breath. This could lead to the assumption that projects in plant construction ...
Continue reading ?
Order BOMs

Order bills of materials in mechanical and plant engineering

The order parts lists are an important control element in mechanical and plant engineering. In this way, the growing parts list helps the constantly changing requirements ...
Continue reading ?
Batch management for medical devices

Manage batches for medical devices

Companies that manufacture medical devices in particular are obliged to manage these products in batches. This is especially true for all...
Continue reading ?
With MariProject for integrated project calculation

With MariProject for integrated project calculation

The project calculation for customer offers is often a big challenge for the sales department of a company. This applies across all ?project-driven? ...
Continue reading ?
plant construction

MariProject 6.6 for plant construction companies

The integration of MariProject into the SAP Business One ERP solution makes it possible to consistently streamline processes in project-oriented, medium-sized plant construction companies.
Continue reading ?
New version ? MariProject 6.6

New version ? MariProject 6.6

A new major release on MariProject for SAP Business One is now available. Again many new features are on ...
Continue reading ?
SAP Business One extension

SAP Business One extension - what you should consider

As a company that is introducing or has already introduced SAP Business One, sooner or later you will come across the topic of extensions...
Continue reading ?
plant construction

ERP for plant construction ? complex and project-driven

An ERP for plant construction has the task of accompanying and controlling the production of mostly complex plants. In doing so, ...
Continue reading ?
GMP

GMP standards for ERP in the pharmaceutical industry

Good manufacturing practice (GMP) is a system designed to ensure that products are consistently manufactured and controlled according to quality standards...
Continue reading ?
MariProject 6.5

New MariProject version 6.5

The new version MariProject 6.5 is now available. MariProject has again received some improvements and extensions. There are functions...
Continue reading ?
Rental of SAP Business One

Renting with SAP Business One

With MariProject, the SAP Business One extension for project-oriented business and plant construction, some tasks can be mapped, which can initially ...
Continue reading ?
updates

MARIProject new major release 6.1

The new major release 6.1.000 is available for MariProject, the SAP Business One industry software for service providers, IT companies and plant manufacturers. The following ...
Continue reading ?
updates

MARIProject version 6.0 is here

It was announced for a long time. The new version 6.0 of MARIProject is now available. The new major release comes with a strong ...
Continue reading ?
updates

New version MariProject 5.7.001.1

MariProject, the SAP Business One industry software for service providers, IT companies and plant manufacturers, is available in the new version 5.7.001.1 ...
Continue reading ?
0

Leave a Reply

Your email address will not be published. Required fields are marked *
You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>